Building steel estimator

A first estimate for budgeting; only the structural drawings and the engineer's take-off give the exact quantity.

Total floor area—
Rebar—
Approximate steel cost—
Consumption rates (kg per m² of floor area): concrete 38–50 Rebar; steel 55–75 sections + 10–16 Rebar. These are empirical averages and vary with soil type, spans, seismic zone and design.
Do you have the project's bill of quantities (BOQ)?Send the file to get a bulk Pro-forma invoice at a special price.